location:HOME > Support > i7000ATE > FAQ

Basic composition of i7000 test.

Post time: 2023-06-19 17:06:00 Click:

Basic composition of i7000 test.

4 major parts:

  1. stimulus: signal source

  2. measurement: measurement

  3. Switching: exchange, a small number of devices are connected to the test point through the exchange circuit

  4. Software platform: control the connection between the test point and the signal source/measurement equipment, equipment communication, test procedure compilation, test result judgment, etc.


Previous Posts:What functions and devices are mainly tested by i7000? Next Chapter:How does the i7000 test platform communicate with the device?

ADSYS

Tel:+86-512-6825-8529
Mobile:18262021089/13382188900
WeChat ID:13382188900
Email:charles@adsys.com.tw

Address:302, Block 15, No.158, Jinfeng Road, Suzhou New District, Jiang-Su Province, China. (215163)
Contact: Charles Chan


WeChat
All right reserved © ADSYS technologies, technical support:CNVP